The Ultimate New Build Snagging Checklist: 200+ Items to Inspect Room by Room Before You Sign Off

The Ultimate New Build Snagging Checklist: 200+ Items to Inspect Room by Room Before You Sign Off
Free PDF available for this topicDownload Snagging Checklist

How to Use This Checklist

Severity Ratings Explained

RatingMeaningExamplesDeveloper Must Fix?
CriticalSafety risk, building regulation breach, or structural issueNo fire stops, missing earth bonds, structural cracksYes — before completion if possible
MajorSignificant defect affecting function, weather-tightness, or complianceLeaking windows, faulty boiler, non-functioning extract fansYes — within defects liability period
ModerateNoticeable quality issue that should be remediedPoor paintwork, uneven tiling, stiff doorsYes — most developers will fix
MinorCosmetic or small finishing issueSmall paint touch-ups, tiny chips, slight marksUsually — but may argue within tolerance

Equipment You'll Need

ItemWhat It's For
Smartphone or tabletPhotos, videos, and notes
Spirit level (600mm minimum)Checking walls, floors, worktops, tiles are level and plumb
Torch (bright LED)Inspecting dark corners, under stairs, loft spaces, behind units
Socket tester (plug-in type, under £15)Checking all sockets are correctly wired — identifies reversed polarity, missing earth
Tape measure (5m minimum)Checking room dimensions match specification
BinocularsInspecting roof tiles, ridge tiles, flashings from ground level
Ladder or step stoolChecking loft hatch, high-level items, tops of wardrobes
Blue painter's tape or sticky dotsMarking snag locations physically on the property
Printed floor planAnnotating locations of each snag for your report

Before You Start

  • Allow enough time — a thorough inspection takes 2-4 hours for a typical 3-bed house, longer for larger properties
  • Go in daylight — natural light reveals paint imperfections, uneven surfaces, and colour mismatches that artificial light hides
  • Ask the site manager to turn on all services — electricity, gas, water, and heating must be live for a proper inspection
  • Bring your specification document — the list of finishes, fixtures, and fittings your contract specifies
  • Check every item, even if it looks fine from a distance — get close to walls, open every door and drawer, run every tap
  • Photograph everything — take a wide shot showing location, then a close-up of the defect, for every single snag

1. External: Front Elevation and Approach

Brickwork and External Walls

ItemWhat to CheckSeverity
Mortar jointsConsistent depth, colour, and profile throughout. No gaps, holes, or crumbling sections. Joints should be tooled (not just raked out)Moderate-Major
Brick conditionNo cracked, chipped, or spalled bricks. Colour consistency across panels (slight variation is normal for many brick types)Moderate
Brick coursesLevel and straight. Use a spirit level on window sill courses. Perpend joints should be reasonably aligned verticallyModerate
Weep holesPresent above DPC, above windows, and above lintels. Must not be blocked with mortar droppingsMajor
DPC (damp-proof course)Visible at least 150mm above external ground level. Not bridged by render, soil, or pavingCritical
Cavity traysVisible above windows, doors, and any penetration through the cavity wall. Should have stop ends and weep holesMajor
Wall tiesNot visible or protruding. If render is used, check for pattern cracking that might indicate tie failureMajor
Render or claddingNo cracks, blown sections, or discolouration. Bellcast beads present at base of render. Expansion joints where requiredModerate-Major
Air bricksPresent and unobstructed for sub-floor ventilation (suspended timber floors) and for combustion appliancesMajor

Roof (From Ground Level)

ItemWhat to CheckSeverity
Ridge tilesStraight, evenly bedded, no gaps in mortar (or dry-fix system clips all present and aligned)Major
Roof tiles/slatesAll present, none slipped or cracked. Courses straight. Tile nibs correctly seated on battensMajor
Hip tilesSecure and evenly spaced. Hip irons present at base if mortar-beddedMajor
VergeDry verge system clips present and straight, or mortar pointing intact with no gapsMajor
FlashingsLead or lead-alternative flashings properly dressed into mortar joints at abutments. No lifting or gapsMajor
ValleysValley tiles or lead valleys properly lapped and sealed. No debris blocking water flowMajor
Soffits and fasciasSecurely fixed, no gaps between boards, paint or finish consistent. Joints neatModerate
Gutters and downpipesAll joints connected. Gutters fall towards downpipes (no sagging or pooling). Downpipe clips secure. Shoes directing water into gulliesMajor
Roof vents and terminalsSVP (soil vent pipe) terminal visible above ridge height. Mechanical extract vent tiles present and unobstructedMajor

Windows and External Doors (Outside)

ItemWhat to CheckSeverity
Frame sealantContinuous bead of sealant between frame and brickwork on all four sides. No gaps, cracks, or missing sectionsMajor
GlazingNo scratches, cracks, or blown units (condensation between panes means failed seal). Check every paneMajor
Trickle ventsPresent on all habitable room windows (Building Regulations Part F requirement). OperableMajor
Drainage slotsDrainage holes at bottom of frames are clear and unblocked by sealant or paintModerate
LintelsSteel or concrete lintels above all openings. DPC tray over lintels. No cracking above openings indicating lintel issuesCritical
CillsStone, tile, or precast cills with drip edge. Properly sealed at ends. Slight fall away from buildingModerate
Front doorMultipoint lock engages smoothly at all points. Door seal compresses evenly. Letter plate operates. Spy hole clear. Threshold seal intactMajor

Driveway, Paths, and Landscaping

ItemWhat to CheckSeverity
Driveway surfaceBlock paving level and properly compacted (no rocking blocks). Tarmac smooth without roller marks. Concrete without significant crackingModerate
Drainage fallsAll hard surfaces fall away from the building. No ponding areas. Drainage channels clearMajor
PathsSlabs level, no trip hazards (more than 5mm difference is a defect). Jointing completeModerate-Major
FencingPosts vertical, panels secure, correct height as per specification. Gate operates and latchesModerate
Turfing/seedingFull coverage as per contract. Turves properly butted together. No large bare patchesMinor
Manhole coversSit flush with surrounding surface. Correct type (recessed tray type in paved areas). Lift easily for accessModerate
Meter boxesDoors close properly. Gas and electric meters accessible. Keys providedModerate
External tapsIf specified, check flow and no leaks at connectionMinor

2. Entrance Hall and Stairs

Hallway

ItemWhat to CheckSeverity
Front door (inside)Opens and closes smoothly. Draught seal compresses fully. All locks operate. Key turns easily. Chain and spy hole fitted if specifiedMajor
Door framePlumb and square. No gaps between frame and wall (or filled/caulked neatly). Architrave mitres tightModerate
FlooringLevel throughout. No creaking boards (some minor settling noise can be normal). Skirting tight to floor. Threshold strips at doorwaysModerate
WallsSmooth plaster finish. No cracks, dents, or nail pops. Run your hand across — feel for ridges and bumps. Check corners are straightModerate
PaintworkEven coverage, no drips, runs, or brush marks. Consistent colour. No paint on carpet, flooring, or glass. Cut-in lines clean at ceiling and cornersMinor-Moderate
CeilingLevel, no cracks (especially along joins in plasterboard). No sagging. Artex or smooth finish as specifiedModerate
Light fittingsCentral pendant works. Switch operates correctly. Two-way switching if there are stairs (test from both ends)Major
Sockets and switchesStraight (not tilted). Flush to wall. All work. Test with socket tester. Screws aligned horizontallyModerate-Major
RadiatorSecurely fixed to wall. No leaks at valves. Heats evenly when system is on (no cold spots indicating trapped air)Major
Smoke/heat detectorPresent in hallway (Building Regulations requirement). Test button produces alarm. Interconnected with other detectorsCritical
Understairs cupboardDoor opens fully. Light works. Consumer unit accessible. Shelving as specified. Floor finishedMinor-Moderate

Staircase

ItemWhat to CheckSeverity
Treads and risersNo creaking (some is tolerable on timber stairs, but persistent loud creaking is a defect). Even tread depth. Risers consistent heightModerate
HandrailSecure at both ends and all brackets. Continuous run (no gaps). Height between 900mm-1000mm from pitch lineCritical
BalustradeSpindles secure (grip and push each one). Gap between spindles must not allow a 100mm sphere through (Building Regulations). No climbable horizontal rails for childrenCritical
LandingAdequate size. Balustrade at top of stairs secure. No gaps a child could fall throughCritical
Carpet/coveringProperly fitted and secured. Gripper rods not exposed. No wrinkles or loose sections on treadsModerate
Newel postsAbsolutely solid — no movement at all when pushed firmly. These are structuralMajor
Stair stringNo gaps between string and wall. Properly decoratedMinor

3. Living Room / Lounge

ItemWhat to CheckSeverity
Walls (all four)Stand in each corner and look along each wall at an angle in natural light. Feel for bumps. Check plaster is smooth and even. No cracks at ceiling junction or around window revealsModerate
PaintworkConsistent coverage on all walls. No missed patches, drips, or roller marks. Satin/gloss on woodwork without runs. Cutting-in clean at all edgesMinor-Moderate
CeilingLevel and smooth. Check for cracks along plasterboard joints (common where boards meet). No staining. Light fitting centredModerate
WindowsAll open, close, and lock. Restrictors work on upper-floor windows. Trickle vents present and operable. Handles tighten fully. No draught when closed. Beading secure on glazingMajor
Window revealsPlaster returns smooth and straight. External sealant visible through window. Window board (cill) level and properly sealed at edgesModerate
Internal doorsOpen and close without catching. Latch engages. No rubbing on carpet. 2-3mm gap around frame. Handles secure. Hinges don't squeakModerate
Skirting boardsTight to wall and floor. Mitres at corners tight. No gaps. Consistent colour/finish. Nails punched and filledMinor
FloorLevel (check with spirit level). Carpet laid without wrinkles. Laminate/engineered boards without gaps or raised edges. No squeaking underfootModerate
SocketsTest every one with socket tester. All straight and flush. TV point connected. Phone/data points if specified. USB sockets charge a deviceMajor
RadiatorLevel, secure, correct size for room. No leaks. Heats evenly. TRV (thermostatic radiator valve) operates smoothly. Pipework neatly routed and clippedMajor
Patio doors (if fitted)Slide/open smoothly. Multi-point lock engages at all points. Threshold sealed. Drainage channel clear. Key operates from both sides if requiredMajor
Fireplace (if fitted)Surround secure. Hearth level. If gas fire: gas connection capped or fire installed and working. If electric: operates on all settings. Flue/chimney correct for fuel typeMajor-Critical

4. Kitchen

The kitchen is typically the most snag-heavy room in a new build. Expect to spend significant time here.

Units and Worktops

ItemWhat to CheckSeverity
Base unit doorsAll aligned — open and close smoothly. No warping. Handles straight and secure. Soft-close mechanisms work on every doorModerate
DrawersSlide smoothly on runners. Soft-close operates. Faces aligned with adjacent doors. Can support reasonable weight without saggingModerate
Wall unit doorsAligned with each other. Secure fixings (pull gently — unit should not move). Soft-close operatesModerate
WorktopsLevel (check with spirit level). Joints properly filled and flush (no lips). No scratches, chips, or burn marks. Edging strips secure on laminate. Upstands sealed at wallModerate-Major
Worktop jointsColour-matched filler. No gaps. Moisture barrier applied underneath at joints (critical for laminate — moisture destroys the chipboard substrate)Major
Plinths/kickboardsSecure, no gaps at floor. Spring clips holding properly. Cut neatly around obstaclesMinor
Cornice/pelmetIf specified, properly fitted and aligned. Mitres tight at cornersMinor
End panelsSecure, correct colour match. Screw holes filled if visibleMinor

Sink, Taps, and Plumbing

ItemWhat to CheckSeverity
SinkNo scratches or chips. Securely mounted (press down on undermount sinks). Overflow works — fill sink, unplug, check overflow drains before main water level reaches rimModerate
TapsHot on left, cold on right. Mixer operates smoothly. No drips when off. Good pressure from both supplies. No knocking or hammering in pipesMajor
Waste and trapOpen under-sink cupboard. Run taps for 2 minutes. Check every joint for drips. Push-fit waste connections properly engaged. No smell from waste pipeMajor
Dishwasher connectionWaste spigot on trap, hot and cold supplies (or cold only depending on model), electrical spur present. Space dimensions correct for standard 600mm applianceModerate
Washing machine connectionHot and cold supply valves present (even if cold-fill only). Standpipe waste. Electrical socket accessible. Space dimensions correctModerate

Appliances

ItemWhat to CheckSeverity
Oven/hobAll rings/burners light and heat. Oven reaches temperature. Door seals properly. Fan operates. If gas: flame blue and stable, no smell. Timer worksMajor
Extractor hoodFan operates on all speeds. Light works. Ducted to outside (check external vent operates) or recirculating with carbon filter present. Filters clean and removableMajor
Integrated fridge/freezerCooling to correct temperature. Door closes properly with furniture door attached. Seal intact. Interior light worksMajor
Integrated dishwasherIf included: completes a cycle. No leaks. Door closes with furniture panel. Salt and rinse-aid compartments accessibleMajor
Washer/dryerIf included: completes a wash and dry cycle. No leaks. Drum rotates smoothly. Drainage worksMajor

Kitchen General

ItemWhat to CheckSeverity
Splashback/tilesGrouting complete, no gaps. Tiles level and evenly spaced. No cracked or chipped tiles. Sealant at worktop junctionModerate
Floor tilesAll solid when tapped (hollow sound means loose/debonded). Level. Grout complete. No cracked tiles. Threshold strip at doorwayModerate-Major
SocketsSufficient number (check specification). All working. RCD-protected (mandatory for kitchen sockets — test with socket tester)Critical
LightingAll fittings work. Under-cabinet lighting if specified. Sufficient light on worktopsModerate
VentilationMechanical extract fan present (Building Regulations Part F). Operates when light switched on or via separate switch/humidistat. Adequate extraction rate (30 l/s intermittent for kitchen)Major
Boiler (if in kitchen)Operates. No error codes. Pressure gauge in green zone. Condensate pipe routed to drain. Flue terminal visible outside and correctly positioned (away from windows/vents)Critical
WindowOpens and closes fully. Trickle vent present. Handles lock. Not obscured by wall unitsMajor

5. Bedrooms

Check every bedroom individually — don't assume they're all the same. Different tradespeople may have worked on different rooms.

Master Bedroom

ItemWhat to CheckSeverity
WallsAll four walls smooth. Check at an angle in natural light. No cracks, especially at corners and ceiling junction. Window reveals straightModerate
CeilingLevel and smooth. No cracks along plasterboard joints. If downlights: all working, evenly spacedModerate
PaintworkEven coverage. No drips or roller marks. Clean cutting-in. Woodwork (door frame, skirting, window board) satin/gloss without runsMinor-Moderate
WindowsOpen, close, and lock. Child-safety restrictors on first floor and above (Part K Building Regulations). Trickle vents present. Good seal — no draught. Handles secureMajor
DoorOpens and closes smoothly. Latch clicks positively. No rubbing on floor. Handle secure. Hinges silent. Lock works if privacy lock specifiedModerate
Built-in wardrobeIf specified: doors slide/open smoothly. Hanging rail secure (pull down firmly). Shelf supports adequate. Light inside works. Interior finished (not bare chipboard)Moderate
FloorLevel. Carpet fitted properly — no wrinkles, edges tucked under skirting. If engineered wood: expansion gap around edges covered by skirting. No squeakingModerate
SocketsAll working (socket tester). Double sockets on bedside walls. USB sockets if specified. TV point if specifiedMajor
RadiatorCorrect size. Level. Heats evenly. TRV operates. No leaks at valves. Pipework clipped and neatMajor
Light switchesTwo-way switching (door and bed side) if specified. Dimmer operates smoothly if fittedModerate

Additional Bedrooms (Check Each One)

ItemWhat to CheckSeverity
Same items as masterEvery wall, ceiling, floor, window, door, socket, radiator — check them all individually in each roomVarious
Room dimensionsMeasure and compare to specification or sales brochure. Significant shortfalls (more than 50mm) should be raisedMajor
Airing cupboardIf located off bedroom: door opens fully, shelving as specified, hot water cylinder accessible, thermostat visible. Immersion heater worksModerate
Loft hatchIf in bedroom ceiling: opens smoothly, loft ladder (if specified) operates safely, loft light works, insulation visible and correctly laid (not blocking eaves ventilation)Moderate-Major

6. Main Bathroom

Bathrooms need careful inspection — water damage from poor installation is one of the costliest defects to fix later.

Sanitaryware

ItemWhat to CheckSeverity
BathNo chips or scratches. Level (check with spirit level). Stable — no movement when you stand in it. Overflow works. Plug holds water. Waste drains quickly (fill completely and release — should empty within 90 seconds)Moderate-Major
Bath panelSecure but removable for maintenance access. No gaps at floor or wall. Clips holding properlyMinor
ToiletFlush operates (test dual flush both buttons). Fills quietly and stops filling completely. No rocking on floor (indicates poor fixing). Seat secure. No leaks at base or cistern connectionMajor
BasinNo chips or scratches. Securely mounted (push down and forward on pedestal; push down on wall-hung). Overflow works. Waste drains quickly. Plug holds waterModerate
Taps (all)Hot on left. Good pressure. No drips. No water hammer. Temperature reaches comfortable hot within 30 seconds. Mixer smooth operationMajor
ShowerThermostat controls temperature accurately. Adequate pressure (should feel strong, not dribbling). Mixer valve operates smoothly. Shower head and hose secure. No leaks at riser bar fixingsMajor
Shower screen/enclosureDoor opens and closes smoothly. Seals at wall and base intact. No leaks when shower running at full — test by running shower for 5 minutes and checking floor outside for waterMajor

Tiling and Waterproofing

ItemWhat to CheckSeverity
Wall tilesAll grouted. No cracked or chipped tiles. Level and evenly spaced. Tap each tile — hollow sound means poor adhesion (potential for tiles falling off)Moderate-Major
Tile cutsNeat and straight around pipes, fixtures, and edges. No rough or sharp edges. Corners either mitred or with trim stripModerate
Silicone sealantContinuous bead around bath/shower tray to wall junction. Around basin to wall. Around shower screen. No gaps. Neat finish. Mould-resistant type in wet areasMajor
Floor tilesLevel. All solid (tap for hollow sound). Grout complete. Non-slip rating appropriate for bathroom. Sealed at walls with sealant, not groutModerate-Major
Shower trayLevel (water should drain to waste, not pool). No cracks. Stable — no flex when stood on. Waste drains quickly. Seal to wall intactMajor
Tanking/waterproofingYou can't see this after tiling, but check for any signs of water damage on the ceiling below the bathroom — staining or damp indicates failed or missing tankingCritical

Bathroom General

ItemWhat to CheckSeverity
Extractor fanOperates (usually linked to light switch with overrun timer — should continue running for 15+ minutes after light off). Adequate extraction rate (15 l/s for bathroom). Actually ducted to outside (not just into loft)Critical
Heated towel railHeats up. Secure to wall. No leaks at valves. Operates independently or with central heating as specifiedModerate
Mirror/cabinetIf specified: securely fixed. Shaver socket works (and has correct isolation transformer — not a standard socket). Cabinet doors/shelves intactModerate
LightingCorrect IP rating for bathroom zones. Pull cord or externally switched — no standard switches inside bathroom. All fittings workCritical
VentilationWindow opens or mechanical extract operates. Building Regulations Part F requires either openable window or mechanical ventilationMajor
DoorPrivacy lock fitted and works from inside. Emergency release on outside (coin slot). Opens outward or sliding (ideally not into bathroom for safety reasons)Moderate
AccessoriesToilet roll holder, towel hooks/rails, robe hooks — as specified. Securely fixed to wall (not just plasterboard — should have proper fixings)Minor

7. En-Suite Shower Room

Check all items from the main bathroom section that apply, plus these en-suite-specific items:

ItemWhat to CheckSeverity
Sound transferFlush toilet, run shower — listen from master bedroom. Excessive noise indicates poor sound insulation between stud wallsModerate
Shower tray drainageEn-suite showers on upper floors are common leak sources. After running shower for 5 minutes, check ceiling below for any dampnessCritical
Ventilation duct routeExtract fan must duct to outside — in many new builds the duct runs through the loft. Check in loft that ducting is properly connected and insulated (to prevent condensation)Major
Hot water pressureRun shower while someone flushes the toilet or runs a tap elsewhere. Pressure and temperature should remain stable (combi boiler systems are more susceptible to pressure drops)Major
Door clearanceDoor should clear shower tray/enclosure. Common snag: shower door hits bathroom door or towel railModerate
Waterproof flooring thresholdWhere en-suite floor meets bedroom carpet — threshold strip present, waterproof seal intact, no path for water to reach carpetMajor

8. Utility Room (If Applicable)

ItemWhat to CheckSeverity
Plumbing connectionsHot and cold supply valves for washing machine. Standpipe waste. Check all connections for leaksMajor
Tumble dryer provisionVent to outside or condenser drain point. Electrical socket in correct positionModerate
Sink (if fitted)Same checks as kitchen sink — taps, waste, overflow, sealModerate
Worktop and unitsSame checks as kitchen — alignment, soft close, worktop level and sealedModerate
FloorWaterproof finish (tile, vinyl). Sealed at walls. Falls to drain if floor drain fittedModerate
Boiler (if here)Full checks: operates, no errors, pressure correct, condensate drains, flue properly positioned outsideCritical
VentilationOpenable window or extract fan. Essential in room with boiler or drying appliancesMajor

9. Garage (If Applicable)

ItemWhat to CheckSeverity
Garage doorOpens smoothly (manual or electric). Locks securely. Auto-reverse on electric doors works (safety requirement). Remote controls provided if electricMajor
Fire door to houseIf integral garage: door must be FD30 fire door with self-closing device. Intumescent strip and smoke seal. Step up into house (not level — building regulation requirement to prevent fuel fumes entering house)Critical
FloorConcrete finished smoothly. Falls to front (away from house). No significant cracking. Power-floated or as specifiedModerate
ElectricsLight works. Sockets present (at least one double). Consumer unit or sub-board if separate supply. RCD protectedMajor
Walls and ceilingPlasterboard fire barrier on house side (30 minutes fire resistance). Boarded and sealed at ceiling if room aboveCritical
RoofNo daylight visible. Felt underlay intact. If flat roof: no pondingMajor
DrainageGully or channel drain at entrance if driveway slopes towards garageModerate
Eaves/ventilationVentilation provided as required. No bird/pest ingress pointsMinor

10. Loft Space

ItemWhat to CheckSeverity
Loft hatchOpens easily. Insulated on top side. Draft-sealed around frame. Loft ladder (if specified) operates safely and locksModerate
InsulationMinimum 270mm mineral wool between and over joists (current Building Regulations Part L). Evenly laid. Not compressed. Not blocking eaves ventilationMajor
Roof structureTruss clips present at wall plate. No broken or damaged trusses. Bracing installed as per truss designer's layout. No obvious deflectionCritical
Felt/membraneBreathable roofing membrane intact. No tears or gaps. Properly lapped at joints. Dressed into gutters at eavesMajor
VentilationClear air path at eaves (insulation not blocking). Ridge vent or tile vents present if specified. Cross-ventilation achievedMajor
Water tanksIf present (vented hot water system): properly supported on platform over joists. Insulated. Lid fitted. Overflow pipe runs to outside. Ball valve operatesMajor
PipeworkAll pipes in loft insulated against freezing. No leaks at joints. Properly clippedMajor
ElectricsLight fitted and works. Junction boxes accessible (not buried under insulation). Cables properly clipped and not lying on insulation without supportMajor
Extract fan ductingBathroom and kitchen extract ducts run to external terminals (not just venting into loft). Ducts insulated to prevent condensation. Properly connected at both ends — no gapsCritical
Party wall (if terraced/semi)Fire stopping present at party wall junction with roof — full height barrier of mineral wool or fire-rated board. Gaps around pipes and cables sealed with intumescent materialCritical
DebrisBuilder's debris removed — offcuts of timber, insulation, packaging, food wrappers (yes, this happens). Mortar droppings cleaned upMinor

11. Building Services and Systems

Heating System

ItemWhat to CheckSeverity
BoilerFires and heats water. No error codes on display. Pressure gauge reads 1-1.5 bar (when cold). Gas certificate provided (CP12/benchmark). Condensate pipe insulated if external run. Flue terminal correctly positionedCritical
ThermostatControls heating. Programmable timer works. Located in hallway or living area (not near heat source or in direct sunlight). Smart thermostat connected if specifiedMajor
All radiatorsEvery radiator in every room heats fully and evenly. No cold spots (top = air, bottom = sludge, one side = valve). TRVs turn. Bleed valves present. No leaks at any valve or jointMajor
Underfloor heatingIf fitted: heats evenly across floor. Individual room thermostats work. No cold zones (indicating damaged pipe loops). Check all manifold connections for leaksMajor
Hot waterReaches all taps within reasonable time. Temperature adequate. If unvented cylinder: tundish present, discharge pipe visible outside, expansion vessel correct pressureMajor

Electrical System

ItemWhat to CheckSeverity
Consumer unitClearly labelled with all circuits. RCDs present and trip when tested (press test button). MCBs for each circuit. RCBO units if specified. Accessible locationCritical
All sockets (every one)Test with plug-in socket tester in every single socket in the house. Checks for correct wiring, earth, and polarity. Takes 5 seconds per socket — don't skip anyCritical
All light switchesEvery switch operates its corresponding light. Two-way switches work from both positions. Dimmer switches dim smoothly without flickeringModerate
Smoke detectorsOne on each floor minimum (Building Regulations). Interconnected (pressing test on one triggers all). Mains-powered with battery backup. Heat detector in kitchenCritical
Carbon monoxide detectorPresent in rooms with combustion appliances (gas boiler, gas fire). Tests positive. Mains-powered with battery backup preferredCritical
EV chargerIf specified or new builds post-June 2022 (Building Regulations Part S): present and functional. Correct type. App connects if smart chargerMajor
External lightingPIR security lights work. Front door light works. Any garden or path lighting operationalModerate
DoorbellWorks (wired or wireless as specified). Audible throughout house. Smart doorbell connected if specifiedMinor

Plumbing and Drainage

ItemWhat to CheckSeverity
StopcockLocated (usually under kitchen sink or in utility). Turns off and on. Actually stops water flow when closedCritical
All tapsRun every tap in the house simultaneously for 2 minutes. Check flow and pressure doesn't drop unacceptably. No water hammer. No discoloured waterMajor
All wastesFill every sink, basin, and bath. Release simultaneously. All should drain without gurgling (gurgling indicates venting issue). Check all traps for leaksMajor
External drainageLift manhole covers. Check inside is clean (no builder's debris). Rodding access points present. Gullies not blockedMajor
Soil vent pipeExtends above roof line. No leaks at joints. Anti-bird cage on terminalMajor
Outside tapIf fitted: isolating valve inside. No leaks. Backflow prevention device (double-check valve)Minor

12. Rear Garden and External Rear

ItemWhat to CheckSeverity
Patio/pavingLevel. Falls away from house. No ponding. Joints properly filled. Slabs stable (no rocking)Moderate
Rear elevationSame brickwork, render, and cladding checks as front elevationModerate-Major
Rear windows and doorsSame checks as front. Bi-fold doors: all panels slide, multi-point locks engage, threshold sealed, drainage clearMajor
Fencing and boundariesCorrect specification. Posts secure. Panels level. Gates latch. Check which boundaries are yours (check deed plan)Moderate
Retaining wallsIf garden has level changes: retaining walls properly built with drainage behind. No bulging or crackingMajor
Drainage and gulliesAll downpipes discharge into gullies. Surface water drains clear. Soakaway area identified if usedMajor
Ground levelsSoil or paving at least 150mm below DPC. Flower beds not piled against house walls. Air bricks unblockedMajor
Garden finishTurf or seed as specified. Topsoil depth adequate (not just builder's rubble with a skim of soil). Basic landscaping complete per contractModerate

13. Communal Areas (Apartments and Flats)

If you're buying a flat or apartment, these additional areas affect your property even though they're shared.

ItemWhat to CheckSeverity
Communal entranceDoor entry system works. Fob/key provided. Door closer operates. Lock secureMajor
Corridors and lobbiesDecoration complete. Fire doors self-closing with intumescent strips and smoke seals. Emergency lighting works. Smoke detectors presentCritical
StairwellsHandrails secure. Fire signage present. Emergency lighting. Smoke ventilation (AOVs) — ask site manager to demonstrateCritical
Lift (if applicable)Operates to all floors. Emergency phone works. Displays correct floor. Doors open smoothly. Certificate displayedMajor
Bin storesAccessible. Correct bins provided. Door/gate locks. LightingModerate
Car parkAllocated space correct size and location per contract. Line markings present. Lighting adequate. EV charging point if specifiedModerate
Post boxesCorrect number assigned. Key works. SecureMinor
Cycle storageIf specified: secure, accessible, rack or space providedMinor
Sound insulationWhile at the property, listen for noise from adjacent flats above, below, and either side. Excessive sound transfer through party walls or floors is a defect (Building Regulations Part E sets minimum standards)Major

14. Documentation and Handover Checks

These aren't physical snags, but missing documentation is one of the most common issues at handover — and missing documents can cause serious problems later.

DocumentWhy You Need ItWhen You Should Receive It
Gas safety certificate (CP12)Legal requirement. Proves boiler installation is safe and compliantAt completion
Electrical installation certificate (EIC)Confirms electrical system meets BS 7671. Essential for insurance and resaleAt completion
Energy Performance Certificate (EPC)Legal requirement for all property sales. Shows energy ratingBefore marketing (should already exist)
NHBC/warranty certificateConfirms warranty cover. Needed for mortgage lenderWithin weeks of completion — chase if not received within 28 days
Building control completion certificateConfirms building passed all regulatory inspections. Essential for resaleAt or shortly after completion — may take weeks from local authority
Boiler benchmark certificateCompleted commissioning record in the boiler manual. Required for manufacturer's warrantyAt completion (in boiler manual)
Appliance manuals and warrantiesInstructions and warranty registration for all fitted appliancesAt completion
Window FENSA certificateConfirms windows comply with Building Regulations. Needed for resaleUsually arrives by post within 6-8 weeks
Home user guideConsumer Code requirement. Instructions for operating and maintaining your homeAt completion
KeysAll keys for all doors, windows, meter boxes, garage. Minimum 2 setsAt completion
Alarm code and fobsBurglar alarm instructions, master code, and any fobs or sensorsAt completion
Management company detailsContact details for managing agent if leasehold or estate management companyAt or before completion

How Many Snags Should You Expect?

Property TypeTypical Snag CountRange
1-2 bed apartment30-6015-100+
3-bed semi-detached50-10025-150+
4-bed detached80-15040-200+
5+ bed executive home100-200+60-300+

These numbers are from professional snagging companies based on thousands of inspections. A low snag count doesn't necessarily mean a better-built home — it might mean a less thorough inspection. Professional inspectors typically find 2-3 times more snags than homeowners doing their own check.

For typical snag counts and what constitutes each severity level, see our common defects encyclopaedia.

Recording and Reporting Your Snags

How to Document Each Snag

For each defect you find, record the following:

DetailExample
LocationMaster bedroom, rear wall, left of window
DescriptionPlaster crack running diagonally from window corner towards ceiling, approximately 300mm long, 1mm wide
SeverityModerate — cosmetic but indicates possible lintel movement
Photo referenceIMG_0234 (wide) and IMG_0235 (close-up)
Floor plan markPoint 47 on annotated floor plan

Submitting Your Snag List

  • Email is best — creates a dated, written record. Send to the site manager and customer care team
  • Include all photos as attachments or in a shared folder linked in the email
  • Number every snag — makes it easier to track which have been completed during follow-up inspections
  • Request written acknowledgment within 7 days and a proposed schedule for repairs
  • Keep copies of everything — your snag list, their responses, and all correspondence

For detailed guidance on the reporting process, developer response times, and what to do if snags aren't fixed, see our complete snagging process guide.

Quick-Reference Printable Summary

Before your inspection, ensure you can tick off every area:

AreaKey FocusChecked?
Front exteriorBrickwork, roof, windows, driveway, drainage
Entrance hall and stairsFront door, staircase safety, smoke detectors
Living roomWalls, windows, doors, sockets, radiator
KitchenUnits, worktops, appliances, plumbing, ventilation
Master bedroomWalls, windows, wardrobes, sockets
Bedroom 2Same as master
Bedroom 3+Same as master (check each individually)
Main bathroomSanitaryware, tiling, waterproofing, extractor
En-suiteSame as bathroom plus sound transfer, drainage
Utility roomPlumbing connections, boiler, ventilation
GarageDoor, fire door, electrics, floor
LoftInsulation, structure, extract ducts, fire stopping
Heating systemBoiler, all radiators, thermostat, hot water
Electrical systemConsumer unit, all sockets, smoke/CO detectors
PlumbingStopcock, all taps, all wastes, external drainage
Rear gardenPatio, boundaries, ground levels, rear elevation
Communal areas (flats)Fire doors, entry system, lift, sound insulation
DocumentationAll certificates, manuals, keys, codes

Frequently Asked Questions

Can I snag my home before completion?

Many developers allow a pre-completion inspection (PCI), typically 1-2 weeks before your completion date. Some restrict access or limit time. If your developer offers a PCI, take it — it's your best opportunity to get defects fixed before you move in. If they refuse, you can still snag immediately after completion and during the defects liability period. See our snagging process guide for how to arrange access.

Do I need a professional snagging company?

You don't have to — this checklist covers everything a professional would check. However, professionals have experience identifying defects that are easy to miss (particularly structural and building regulation issues), carry specialist equipment (thermal imaging cameras, damp meters, drain cameras), and produce a formal report that developers take seriously. A typical professional snagging inspection costs £300-£500 for a standard house. If your budget allows, it's a worthwhile investment — especially as a first-time buyer.

How long do I have to report snags?

There's no legal deadline, but practically: report snags as soon as possible. The developer's defects liability period (typically 2 years under NHBC warranty) covers most issues. After 2 years, only structural defects are covered under the warranty's insurance period (years 3-10). Reporting defects promptly also strengthens your position — it's harder for a developer to argue a defect was caused by wear and tear if you reported it in the first week.

What if the developer says something is within tolerance?

Developers often claim issues are "within tolerance" or "within specification." NHBC Standards Chapter 1 includes guidance on tolerances — for example, a 3mm deviation in a plaster finish is generally considered within tolerance, while 5mm is not. If you disagree, ask them to show you the specific standard they're referring to. For more on tolerance standards and dispute resolution, see our snagging disputes and legal guide.

Should I hold back retention money?

On a new build purchase, you typically can't hold back part of the purchase price as retention (unlike a building contract). However, your solicitor can raise significant snags with the developer's solicitor before completion, and serious safety defects could justify delaying completion. Discuss this with your solicitor — see our conveyancing guide for how snagging fits into the legal process.

What about snags I find months after moving in?

Many defects only become apparent with use — a roof leak during heavy rain, condensation problems in winter, or cracks that appear as the building settles. You can and should report these at any time within the defects liability period. Keep an ongoing snag list and report new items in batches rather than individual emails. Seasonal defects (heating issues, drainage problems) may only manifest at certain times of year — this is entirely normal and the developer should still fix them.